Parking Garages
Our company has decades of experience in post-tensioning used in commerical parking garages.
NAVY PIER – GARAGE Location: Chicago, IL Contractor: McHugh Construction PT Quantity: 450,000 feet Facts: The stressing operations for this garage proved to be a challenge. The garage was sandwiched between two existing structures. Furthermore, no stressing was allowed on the third side based on an agreement with nearby condominium owners and the City. After being awarded the project, AMSYSCO developed means and methods to solve the lack of stressing access as well as other complex constructability issues.
PARKVIEW WEST – UNDERGROUND GARAGE Location: Chicago, IL Contractor: Goebel Forming PT Quantity: 400,000 feet in Garage/Lid (600,000 feet in Tower) Facts: The underground garage was built using a “top-down” construction. Due to limitations in stressing, the beam tendons were stressed through the top of the beam instead of at the face of the beam. > Download ENR feature story ![]() MUSEUM OF SCIENCE AND INDUSTRY – Location: Chicago, IL Contractor: Schwendener Construction PT Quantity: 2.8 million feet (0.6” diameter PT) Facts: The underground garage addition was built to hold 1500 cars as well as a permanent exhibition for some museum displays. The underground garage serves as the climate-controlled main entrance to the Museum, which helps visitors stay warm during Chicago’s winter weather. |
|
|||||||||
|
Amsysco Inc 1200 Windham Parkway Romeoville, IL 60446 phone: 630 296 8383 fax: 630 296 8380 |
![]() |
||||||||||
|
WHY AMSYSCO | PRODUCTS & SERVICES | PROJECTS | BLOG | LINKS | SITE MAP | PRIVACY | LEGAL | CAREER |
|||||||||||
2010, Copyright AMSYSCO, INC |
|||||||||||