This short video shows the process of cutting extruded post-tension cables into individual tendons. Eventually the tendons are secured and anchorages are attached. Then the tendons are packaged and shipped to construction sites.
This process is for Unbonded Post-Tensioning System used in Concrete Construction. Visit www.amsyscoinc.com for further information.
This short video shows the final part of process of extruding post-tension cables into reels. Eventually the reel is cut into individual tendons (refer to http://www.youtube.com/watch?v=iq_ZZV… ).
This process is for Unbonded Post-Tensioning System used in Concrete Construction.
This video shows the Plastic Extrusion process for Unbonded Post-Tensioning. Raw materials include steel PC Strand, corrosion-inhibiting Post Tensioning coating and HDPE plastic with color concentrate.
The steel strand is moving at over 200 feet per minute in the extrusion machine. First the steel PC strand is coated with corrosion-inhibiting Post-Tension Coating (“grease”). Then, the coated steel has either 40ml or 50ml of HDPE (high-density-polyethylene) plastic extruded over it. Finally, the extruded strand is cooled within a long trough of chilled water.
Please CLICK HERE to view other AMSYSCO videos about Post-Tensioned Concrete at the “amsysco” Channel.
I visited the “Chicago Model City” exhibit this weekend. The 3-D architectural models gave me a great birds-eye-view of downtown Chicago. The great thing was that I could see a lot of our Post Tensioned High-Rise Buildings within a 320 square-foot area.
The “Chicago Model City” exhibit is open daily and the Chicago Architecture Foundation gives a history of Daniel Burnham’s city plan for Chicago on Fridays and Saturdays 12:30PM. Kudos to the Chicago Architecture Foundation.
Our blog will announce AMSYSCO news and provide commentary about the Post-Tensioned Concrete and Commercial Construction industries. Our audience includes Architects, Structural Engineers, General Contractors, Concrete Contractors and Ironworkers. Please visit our main website for our Post-Tensioning reinforcement products and services.
www.amsyscoinc.com
1200 Windham Parkway
Romeoville, IL 60446 P: 630-296-8383
info@amsyscoinc.com